Application
Hotel and Retail Wall Tiles
A hotel corridor or a retail fit-out needs a series that repeats room after room, and a spare box that matches the batch when a wall is damaged.
What project buyers need first
- A series that will still exist when phase two is ordered
- Shade and face consistency across rooms and floors
- Packing that survives repeated handling on a live site
- A stated maintenance and repair route for damaged walls
Schedules and phase ordering
Send the room schedule with quantities by room type. We return a single batch plan covering the whole phase, plus a reserve percentage for damage and later repair. Ordering rooms separately is how a hotel ends up with two shades in one corridor.
Reactive and metallic glazes in public areas
Reactive glazes vary by design — that is the product. For long corridors, approve a range and a layout mock-up rather than a single tile, because the variation only reads across a run.
Slip and wet areas
Wall tiles are not floor tiles. Where a scheme wraps a shower or a wet room, the floor specification is separate and must meet the project's slip requirement; we do not claim a slip rating for a wall product.
Working with hotel and restaurant projects
As a hotel bathroom tile supplier we quote against room schedules rather than square metres, and hold a reserve for phase two. Restaurant wall tile ideas usually start from a photograph — send it and we will match the closest series and glaze.
Series used on this application
All series →Send the drawing, get a counted quote
A room schedule, a drawing or a photograph of the scheme — any of them works.


